Gardermoen district heating

挪威 / 集中供热 / Power plant

The district heating plant at Gardermoen opened in 1998.

  • 1998
    投入使用
  • 47 MW
    装机容量
  • 68.9、妇女
    年生产

mg游戏官方网站 Varme took over the plant and the district heating network at Gardermoen in November 2015 and has since been responsible for operating the facility.

The main network is 20 kilometres long and supplies several large commercial buildings, the largest being Oslo Airport Gardermoen.

Gardermoen district heating
Gardermoen district heating. (Photo: mg游戏官方网站 Varme)

 

The district heating plant at Gardermoen chiefly makes use of bio-energy sourced from the local area. Peak load requirements are met by electric boilers and heating oil.

 

公司 所有权份额
mg游戏官方网站 100%

Find out more about our activities in 挪威